Operations

*For optimal performance of the site, we recommend the total downloads be kept under 1GB each time.
**If you're having trouble downloading the files, kindly disable your popup blockers.

 
Download All
02/03/2024
09/04/2024
Sugar Overhead Crane Pre-use Check and Usage Rev 4 
 
10/01/2024
09/04/2024
OP707 - Leak Detection Rev 2 
 
26/03/2024
02/04/2024
Afton Raw Material Handling Guide 
 
10 
26/03/2024
02/04/2024
Plant equipment identification system  
 
18/12/2023
21/02/2024
OP705-Transporting, Handling, Charging from and Filling of Drums and Totes  
 
18/12/2023
21/02/2024
OP719-Heating up drum/ totes in Electrical Heater 
 
02/09/2023
02/02/2024
Filter Cartridge Change and Filter Housing Operations 
 
19 
04/09/2023
07/12/2023
Additional PPE Requirement for Hazardous Chemicals  
 
23/08/2023
07/09/2023
Gear Oil Scrubber Liquid Change 
 
28/08/2023
07/09/2023
Heating up drum/ totes in E-6 heater 
 
08/07/2023
07/09/2023
Plant Emergency Shutdown  
 
24/05/2023
04/08/2023
Afton Magnesium Blend Loadout Line Flushing After Hitec 9300 Loading with material from T-1118 
 
28/12/2022
04/08/2023
OP706 - Flexibag loading 
 
28/03/2023
04/08/2023
Filter Press 2 and 3 Operating Guidelines 
 
20/04/2023
04/08/2023
Purging piping / equipment / vessels 
 
28/04/2023
04/08/2023
Pressure Washing with Pressure Washer 
 
13 
20/04/2023
04/08/2023
Container loading Using a Vapor Balance System and Not Using A Vapor Balance System 
 
28/01/2023
13/02/2023
H2S Monitoring and Headspace Testing for Afton Blend Products Loading to ISO Container  
 
28/12/2022
13/02/2023
Glycol decomposition policy  
 
02/02/2023
13/02/2023
Depressurizing a hose/line before disconnecting 
 
28/01/2023
13/02/2023
Molten Maleic Anhydride ISO container Unloading Using A Vapor Balance System/Not Using A Vapor Balance System  
 
30/12/2021
15/11/2022
Nitrogen Tank Storage 
 
30/12/2021
15/11/2022
Boiler start-up and shut-down procedure 
 
30/09/2021
15/11/2022
Filter Press 1 Operation and Cleaning 
 
23/02/2022
14/09/2022
Acid neutralization and Chemical Additions to glycols and Glycol Ethers  
 
30/12/2021
03/08/2022
Sampling procedure  
 
31/01/2022
03/08/2022
Transporting, Handling and Charging Drums and Totes 
 
30/12/2021
15/06/2022
Vacuum blowers  
 
30/12/2021
15/06/2022
Operating Procedure for Storage of Materials 
 
30/12/2021
15/06/2022
Dual Exchanger (Cooling Water/Steam) 
 
30/12/2021
15/06/2022
LEL Emergency Response and Communication Protocol for QBR-GBR-HG Process  
 
30/12/2021
15/06/2022
Procedure for Isolation of Pipe Lines After Use/ When Not In Use 
 
30/12/2021
15/06/2022
Storage tank scrubber checklist  
 
30/12/2021
15/06/2022
Container unloading Using A Vapour Balance System/Not Using A Vapor Balance System 
 
30/12/2021
15/06/2022
Preparation for nitrogen maintenance  
 
30/12/2021
15/06/2022
Product Storage Tank Qualifying Procedure  
 
30/12/2021
15/06/2022
Process reactor scrubber check  
 
30/12/2021
15/06/2022
Personnel Protection Against Ethylene Oxide Exposure  
 
30/12/2021
15/06/2022
Operating Procedure For Reactor Cleaning  
 
30/12/2021
15/06/2022
Oxide system emergency response overview  
 
30/12/2021
15/06/2022
Vessel cleaning for change of glycol tank service  
 
30/12/2021
15/06/2022
Chiller system-chilled water procedure  
 
30/12/2021
15/06/2022
Drummed and bagged material receiving  
 
30/12/2021
15/06/2022
Transfer Material from Tank to Tank via common Transfer Pipeline 
 
30/12/2021
15/06/2022
Shell Glycols, HG, QBR and GBR 
 
31/01/2022
15/06/2022
Storage and Labelling of Materials Stored in Portable Containers 
 
30/12/2021
02/06/2022
Boric Jib Crane Pre-use Check and Usage  
 
29/01/2022
02/06/2022
Management of safety relief valve  
 
09/01/2022
02/06/2022
Container guaging procedure  
 
30/07/2021
02/06/2022
Operations Handover