4
02/03/2024
09/04/2024
Sugar Overhead Crane Pre-use Check and Usage Rev 4
48.5Kb
2
10/01/2024
09/04/2024
OP707 - Leak Detection Rev 2
53Kb
0
26/03/2024
02/04/2024
Afton Raw Material Handling Guide
127Kb
10
26/03/2024
02/04/2024
Plant equipment identification system
461Kb
3
18/12/2023
21/02/2024
OP705-Transporting, Handling, Charging from and Filling of Drums and
Totes
50.5Kb
0
18/12/2023
21/02/2024
OP719-Heating up drum/ totes in Electrical Heater
46.5Kb
1
02/09/2023
02/02/2024
Filter Cartridge Change and Filter Housing Operations
544.5Kb
19
04/09/2023
07/12/2023
Additional PPE Requirement for Hazardous Chemicals
185Kb
2
23/08/2023
07/09/2023
Gear Oil Scrubber Liquid Change
40Kb
2
28/08/2023
07/09/2023
Heating up drum/ totes in E-6 heater
44Kb
3
08/07/2023
07/09/2023
Plant Emergency Shutdown
1.7Mb
4
24/05/2023
04/08/2023
Afton Magnesium Blend Loadout Line Flushing After Hitec 9300 Loading with material from T-1118
35.5Kb
2
28/12/2022
04/08/2023
OP706 - Flexibag loading
4.4Mb
2
28/03/2023
04/08/2023
Filter Press 2 and 3 Operating Guidelines
56Kb
1
20/04/2023
04/08/2023
Purging piping / equipment / vessels
80Kb
1
28/04/2023
04/08/2023
Pressure Washing with Pressure Washer
62Kb
13
20/04/2023
04/08/2023
Container loading Using a Vapor Balance System and Not Using A Vapor Balance System
13.4Mb
3
28/01/2023
13/02/2023
H2S Monitoring and Headspace Testing for Afton Blend Products Loading to ISO Container
49Kb
4
28/12/2022
13/02/2023
Glycol decomposition policy
23.1Kb
3
02/02/2023
13/02/2023
Depressurizing a hose/line before disconnecting
23.7Kb
3
28/01/2023
13/02/2023
Molten Maleic Anhydride ISO container Unloading Using A Vapor Balance System/Not Using A Vapor Balance System
72.5Kb
3
30/12/2021
15/11/2022
Nitrogen Tank Storage
24.3Kb
3
30/12/2021
15/11/2022
Boiler start-up and shut-down procedure
26.7Kb
1
30/09/2021
15/11/2022
Filter Press 1 Operation and Cleaning
27.4Kb
4
23/02/2022
14/09/2022
Acid neutralization and Chemical Additions to glycols and Glycol Ethers
24Kb
4
30/12/2021
03/08/2022
Sampling procedure
34.2Kb
2
31/01/2022
03/08/2022
Transporting, Handling and Charging Drums and Totes
47.5Kb
3
30/12/2021
15/06/2022
Vacuum blowers
21.3Kb
6
30/12/2021
15/06/2022
Operating Procedure for Storage of Materials
20.6Kb
3
30/12/2021
15/06/2022
Dual Exchanger (Cooling Water/Steam)
20.9Kb
4
30/12/2021
15/06/2022
LEL Emergency Response and Communication Protocol for QBR-GBR-HG Process
22.8Kb
2
30/12/2021
15/06/2022
Procedure for Isolation of Pipe Lines After Use/ When Not In Use
18.6Kb
3
30/12/2021
15/06/2022
Storage tank scrubber checklist
17.4Kb
6
30/12/2021
15/06/2022
Container unloading Using A Vapour Balance System/Not Using A Vapor Balance System
52.9Kb
2
30/12/2021
15/06/2022
Preparation for nitrogen maintenance
16.6Kb
3
30/12/2021
15/06/2022
Product Storage Tank Qualifying Procedure
19.9Kb
3
30/12/2021
15/06/2022
Process reactor scrubber check
19.4Kb
3
30/12/2021
15/06/2022
Personnel Protection Against Ethylene Oxide Exposure
19.5Kb
2
30/12/2021
15/06/2022
Operating Procedure For Reactor Cleaning
21.3Kb
3
30/12/2021
15/06/2022
Oxide system emergency response overview
1.1Mb
3
30/12/2021
15/06/2022
Vessel cleaning for change of glycol tank service
19.6Kb
3
30/12/2021
15/06/2022
Chiller system-chilled water procedure
23.6Kb
6
30/12/2021
15/06/2022
Drummed and bagged material receiving
22.1Kb
1
30/12/2021
15/06/2022
Transfer Material from Tank to Tank via common Transfer Pipeline
37.5Kb
1
30/12/2021
15/06/2022
Shell Glycols, HG, QBR and GBR
40Kb
2
31/01/2022
15/06/2022
Storage and Labelling of Materials Stored in Portable Containers
49.5Kb
1
30/12/2021
02/06/2022
Boric Jib Crane Pre-use Check and Usage
41.5Kb
2
29/01/2022
02/06/2022
Management of safety relief valve
28.5Kb
4
09/01/2022
02/06/2022
Container guaging procedure
146.5Kb
1
30/07/2021
02/06/2022
Operations Handover
24.6Kb