Instrumentation Calibration Troubleshooting Procedure  
 
05/10/2022
01/11/2022
Maintenance Procedure for Removing_Installation_Erection of Steel Structures_Support_Cladding_Roof Sheet 
 
15/04/2022
25/08/2022
Procedure for Clearing Debris from Perimeter Drain 
 
24/03/2022
25/08/2022
Corrosion Under Insulation (CUI) & Corrosion Under Fireproofing (CUF) Inspection Proedure 
 
10/06/2022
25/08/2022
Procedure for Maintenance Works at Weigh Bridge-2 
 
18/04/2022
25/08/2022
Safety Critical Equipment Selection and Management  
 
28/06/2021
24/11/2021
Piping Reinstatement Procedure_20210628 
 
28/06/2021
24/11/2021
Procedure for Pipe Repair_20210628 
 
28/06/2021
24/11/2021
Pickling and Passivation Procedure_20210628 
 
28/06/2021
24/11/2021
Welding Inspection Procedure_20210628 
 
28/06/2021
24/11/2021
Flushing and Blow Dry Inspection Procedure_20210628 
 
28/06/2021
24/11/2021
Procedure for Isometric Drawings_20210628 
 
28/06/2021
24/11/2021
Procedure for Flange Management_20210628 
 
28/06/2021
24/11/2021
Incoming Material Inspection Procedure_20210628 
 
26/07/2021
24/11/2021
Corrosion Protection for Corrosive Atmospheric Environment 
 
28/11/2019
06/01/2020
Procedure for inspection of check valve 
 
18/12/2019
06/01/2020
Procedure for Inspection of Thief Hatch 
 
21/06/2019
12/07/2019
Work Order Procedure 
 
07/02/2019
28/05/2019
Procedure for Inspection and Testing of New and Existing Manual Ball and Gate Valves 2 inches and above 
 
2-18 Feb 2019 
-
30/04/2019
MP-004 
 
1-12 Dec 2018 
-
14/01/2019
Inspection for Storage Tanks / Pipe Connection 
 
2-18 Sep 2018 
-
03/01/2019
Preventive Maintenance Inspection of Process Transfer Hoses 
 
0-14 Jan 2018 
-
11/05/2018
Exchangers Lifting for service 
 
0-14 Jan 2018 
-
11/05/2018
Dismantle & Installation of Maleic Tank's Level Transmitter DPM-101 
 
0-14 Jan 2018 
-
11/05/2018
Dismantle & Installation of Flowmeter FTB-102 
 
0-28 Jan 2018 
-
11/05/2018
MOC Documentation Filing 
 
0-12 Jan 2018 
-
11/05/2018
Preventive Maintenance of Steam Pressure Regulators 
 
0-12 Dec 2017 
-
24/01/2018
Procedure for carry out Static Discharge Reels inspection 
 
0-12 June 2017 
-
24/01/2018
Procedure of Dismantle & Installation of PO tank's Level Transmitter 
 
0-19 Mar 2017 
-
24/01/2018
Preventive Maintenance of Nitrogen Blanket Regulators  
 
1 - 2 Sep 2016 
-
19/06/2017
Safe Work Procedure for Installation, Removal and Maintenance of Reactor 
 
2 Sep 2016 
-
19/06/2017
Safe Work Procedure for New Pumps Installation and Maintenance of pump  
 
0-1 July 2016 
-
26/05/2017
Procedure for Equipment Predictive Maintenance works 
 
0-12 July 2016 
-
26/05/2017
Procedure of Dismantle & Installation of PO flowmeter 
 
0-1 Mar 2016 
-
26/05/2017
Procedure for carry out maintenance works on the existing plant equipment 
 
0-10 Dec 2015 
-
26/05/2017
Procedure for Dismantle & Installation of SRV 
 
0-29 Sep 2015 
-
26/05/2017
Procedure for Maintenance of critical equipment 
 
0-27/08/15 
-
13/10/2015
Preventive Maintenance Inspection of Reactor using Maximum Operating pressure  
 
0-27/03/15 
-
10/09/2015
Preventive Maintenance Inspection of Reactor Thickness using Ultrasonic Testing 
 
0-26/03/15 
-
10/09/2015
Label procedure for dismantling Equipment 
 
0-06/06/2014 
-
10/09/2015
Preventive Maintenance of Smoke Detector 
 
2-12/03/15 
-
10/09/2015
Preventive Maintenance Inspection of Process Transfer Hoses  
 
1-19/07/13 
-
10/09/2015
Preventive Maintenance Inspection of Rotating Equipments 
 
1-19/07/13 
-
10/09/2015
Preventive Maintenance of LEL. Detector